Module 02 · Bathroom
Bathroom Remodeling
Water is patient. Bathrooms done cheaply fail in the walls, not on the surface, so we build the assembly correctly and document every layer before tile goes up.

Scope of Work
What this project includes.
- Tear-out through to studs, subfloor assessment and repair
- Curbless and walk-in shower assemblies with proper slope
- Cement board, bonded waterproofing membrane, flood testing
- Vanity, storage, and lighting planned around real routines
- Exhaust ventilation sized and vented to the exterior
- Fixture set, caulking, and a final water test before sign-off
100%
Waterproofed to code
Typical Timeline
A full hall bath takes 2 to 3 weeks; a primary suite runs 3 to 5 weeks.
Finish Options
- Large-format porcelain tile
- Floating & built-in vanities
- Matte black & brass fixtures
- Heated tile floors
Project Gallery
Bathroom work in the area.



Other Disciplines
We can carry the rest of the house.
Free Estimate
Let's talk about your project.
Tell us what you want the space to do. We will walk it with you, measure it properly, and put a fixed price in writing.
- Fixed-price estimates with allowances stated up front
- Permits, drawings, and inspections handled in our name
- Floors protected, debris hauled daily, schedules kept
- Licensed, insured crews with references in your township
Prefer to talk
724-742-8150Mon - Fri 7:00am - 6:00pm · Sat by appointment
Serving Mars, PA and surrounding communities



